What we do on the visit

Matt comes himself. He checks what a photo can’t show, talks it through with you, and then your price goes firm. No obligation.

It’s free and usually takes 30 to 45 minutes. It helps if you’re home, but you don’t need to be.

QLD Electrical Contractor Licence 1506492 · SAA Accredited Installer S1602177

What Matt checks

Six things decide whether the system on your proposal fits your house as it is.

01

Your meter box

Whether you have single or three phase power. A bill can’t tell us that; the main switch can.

02

Your switchboard

Whether there’s room for the new breakers, or the board needs work first. If it does, you hear that before any work starts.

03

Where a battery can go

A wall that meets the battery safety standard (AS/NZS 5139), ideally close to the meter box for a short cable run, and whether it needs a cover from sun and rain.

04

Your roof

Tin or tile, one storey or two, which faces get the sun and what shades them.

05

The cable runs

The path the cables take between the panels, the battery and the board. If you already have solar, the inverter and how the panels are wired.

06

How you use power

We talk through sizing with you: big users like air conditioning and hot water, an electric car now or later, and what you’d want running in a blackout.

A meter box and switchboard opened up on one of our jobs, showing the meter, the main switches and the circuit breakers
A meter box and switchboard on one of our jobs. Meter details blurred.

Good to get in advance, not essential

  • A recent power bill
  • Photos of your switchboard and meter box
  • Your inverter’s label, if you already have solar
  • Where you’d like the battery

What your price includes

  • The gear on your proposal. Supplied, installed and commissioned. Products can change with supplier stock.
  • Set-up and paperwork. The network application, app set-up and a compliance certificate.
  • Handover. A walkthrough of how it all works.
  • Travel. Included within 45 minutes’ drive. Further out, the extra drive time is its own line on the proposal.

The federal rebates that apply to your system are set by your install date. Both step down on 1 January 2027, so a later install gets less rebate and costs more.

After the visit

  • 01Firm proposal. Matt tells you when to expect it.
  • 02Accept. Reply to accept. The deposit is usually 40%, the balance due on completion.
  • 03Install. By our licensed electricians, with Matt overseeing.
  • 04Handover. Testing, app set-up and a walkthrough.